First of all, I have to say that I am blown away by our construction crew. Historic flash flood lifting our dinette off the foundation? No problem, just a three hour delay. Record breaking heat wave the next day? No problem. Hard at work, as usual. I am seriously in awe of their ability to work THIS fast in such energy-draining conditions. There may be a popsicle delivery sometime tomorrow.
We had expected today to be a nice, slow day mainly letting the basement wall concrete cure. But, much to our pleasant surprise the crew started on the non-ICF walls today under the front and back porches as well as the garage walls.
|
When we arrived around 9 this morning, they already had a great start on the garage. |
|
Cement quietly curing. |
|
When we left, about 10 minutes later, these guys were getting blocks ready to start the front porch. |
|
Back before lunch, the front porch is done, and the three-car garage was almost done. |
|
Men at work. |
|
View from the driveway, at 5pm. |
|
Garage is done, and I can finally start to see the size of the house in proportion. |
|
Getting ready for the subfloor! |
|
Our future front entry. |
|
Back porch foundation is done. |
|
Coming up: sub floor. |
Print this post
No comments:
Post a Comment
We love hearing from you!