Monday, July 18, 2011

Build - Day 7 - July 18, 2011

Today they have finished up stacking and bracing the basement wall ICF blocks and tomorrow between 10am and noon they will pour the concrete. With the heatwave and high humidity taken into account, the construction of the basement ceiling / main level floor as well as the framing for the front and back porch will start on Thursday.
The front of the house showing the basement window for the exercise room.
Good view of the 'Lego' blocks... ;-)
Peek...
a boo!
Inside the ICF walls showing the plastic framing and horizontal and vertical rebar. 
Another look, now at an angle.
These are not vents, but actually support blocks for the back porch in this picture.